Ensure high yields,consistent performance and durability,First of 52 steps strict quality control and inspection process.
100% Inspection
Before and After Lamination.
Most stringent acceptance criteria and tightest tolerance,Intelligent alarm and stop mechanism in case of any
deviation or errors.
100% EL Testing
Before and Following Lamination
Ensure "Zero" micro crack monitoring before final inspection, Continuous line monitoring and video/photo record for each cell and panel
100% "Zero"
Defects Objective Before Shipment.
Most stringent acceptance criteria and tightest tolerance,
Ensure the best modules on the market- guaranteed!
100% Optimal Testing
Ensure 3% Positive Power Tolerance Comprehensive QC information management
system with barcode ID.Quality traceable system in place to allow quality data flow constantly.
FAQ
Q:What is the minimum quantity for mass purchase ? A:1 pallet,31pieces. Q:What is your payment terms?
A:Our payment term is 70% T/T deposit after signedthe Pl, 30% T/T balance before loading.
Q:How long is your production cycle ?
A:7-15 days after got your deposit.
Q:How many pieces in a carton ?
A:lt depended on the thickness of frame , if it is 30mm ,31pieces per pallet, if it is 35mm, 36 pieces per pallet.